Assessment Year | 2010 |
---|---|
Principal Product | Gas Welding Equipment |
NAICS | 333992: Welding and Soldering Equipment Manufacturing |
SIC | 3548: Electric and Gas Welding and Soldering Equipment |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
120,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 5,355
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $475,839 | 4,758,392 |
kWh
|
$0.100 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $121,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $112,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $37,073 | $6,280 |
$30,286
302,864
kWh
|
$6,787
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $31,106 | $2,000 |
$25,394
253,938
kWh
|
$5,712
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,329 | $1,210 |
$8,448
84,482
kWh
|
$3,881
-
kW-mo/yr
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,308 | $7,450 |
$8,421
84,209
kWh
|
$1,887
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $9,954 | $2,200 |
$7,874
78,742
kWh
|
$2,080
-
kW-mo/yr
|
|
06 | 2.2511: Insulate bare equipment | $8,626 | $1,786 |
$7,047
70,472
kWh
|
$1,579
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,254 | $5,975 |
$5,924
59,240
kWh
|
$1,330
-
kW-mo/yr
|
|
08 | 2.4323: Use optimum size and capacity equipment | $4,552 | $4,531 |
$3,853
38,526
kWh
|
$699
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $121,202 | $31,432 |
$97,247
972,473
kWh
|
$23,955
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $112,576 | $29,646 |
$90,200
902,001
kWh
|
$22,376
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs