ITAC Assessment: MI0199
ITAC logo
ITAC Assessment: MI0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Gas Welding Equipment
NAICS 333992: Welding and Soldering Equipment Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 120,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 5,355
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $475,839 4,758,392
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $37,073 $6,280 $30,286
302,864
kWh
$6,787
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $31,106 $2,000 $25,394
253,938
kWh
$5,712
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,329 $1,210 $8,448
84,482
kWh
$3,881
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $10,308 $7,450 $8,421
84,209
kWh
$1,887
-
kW-mo/yr
05 2.4239: Eliminate or reduce compressed air usage $9,954 $2,200 $7,874
78,742
kWh
$2,080
-
kW-mo/yr
06 2.2511: Insulate bare equipment $8,626 $1,786 $7,047
70,472
kWh
$1,579
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,254 $5,975 $5,924
59,240
kWh
$1,330
-
kW-mo/yr
08 2.4323: Use optimum size and capacity equipment $4,552 $4,531 $3,853
38,526
kWh
$699
-
kW-mo/yr
TOTAL RECOMMENDED $121,202 $31,432 $97,247
972,473
kWh
$23,955
-
kW-mo/yr
TOTAL IMPLEMENTED $112,576 $29,646 $90,200
902,001
kWh
$22,376
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs