46
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Rolling mill machinery and equipment | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IA0226 #06 Y:1999 | 06 | 1999 | Add equipment/ operators to reduce production bottleneck | $54,760 | $210,137 | |
IA0226 #05 Y:1999 | 05 | 1999 | Reduce / eliminate use of disposable product | $2,575 | $2,704 | |
IA0226 #04 Y:1999 | 04 | 1999 | Reduce the pressure of compressed air to the minimum required | $103 | $50 | |
IA0226 #03 Y:1999 | 03 | 1999 | Utilize higher efficiency lamps and/or ballasts | $760 | - | |
IA0226 #02 Y:1999 | 02 | 1999 | Install occupancy sensors | $224 | $865 | |
IA0226 #01 Y:1999 | 01 | 1999 | Use most efficient type of electric motors | $1,279 | - | |
KU0515 #06 Y:1999 | 06 | 1999 | Add equipment/ operators to reduce production bottleneck | $400,000 | $602,110 | |
KU0515 #05 Y:1999 | 05 | 1999 | Utilize a central coolant system for cleaning and reuse of metal working fluid | $3,140 | $7,830 | |
KU0515 #04 Y:1999 | 04 | 1999 | Turn off equipment when not in use | $530 | - | |
KU0515 #03 Y:1999 | 03 | 1999 | Recover waste heat from equipment | $820 | $2,540 | |
KU0515 #02 Y:1999 | 02 | 1999 | Utilize higher efficiency lamps and/or ballasts | $1,660 | $2,430 | |
KU0515 #01 Y:1999 | 01 | 1999 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,780 | $400 | |
WI0312 #07 Y:1997 | 07 | 1997 | Cover containers to minimize evaporative losses | $488 | - | |
WI0312 #06 Y:1997 | 06 | 1997 | Distill contaminated solvents for reuse | $1,071 | $4,000 | |
WI0312 #05 Y:1997 | 05 | 1997 | Install spectral reflectors / delamp | $1,422 | - | |
WI0312 #04 Y:1997 | 04 | 1997 | Utilize energy-efficient belts and other improved mechanisms | $2,170 | - | |
WI0312 #03 Y:1997 | 03 | 1997 | Use filtration, centrifuging to remove contaminants | $2,744 | $7,000 | |
WI0312 #02 Y:1997 | 02 | 1997 | Replace obsolete burners with more efficient ones | $12,702 | $42,000 | |
WI0312 #01 Y:1997 | 01 | 1997 | Train operators for maximum operating efficiency | $153,750 | $30,000 | |
UM0095 #06 Y:1997 | 06 | 1997 | Expand operations into unused space | $6,800 | $400 |