Assessment Year | 1999 |
---|---|
Principal Product | grain processing equipment |
NAICS |
n/a
|
SIC | 3547: Rolling Mill Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
50,000
ft2
|
Annual Production | 400
pieces
|
Production Hrs. Annual | 4,750
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,677 | 817,409 |
kWh
|
$0.036 |
Electricity Demand | $9,625 | 2,808 |
kW-mo/yr
|
$3.43 |
Natural Gas | $15,738 | 3,755 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,701 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,279 | - |
$891
29,601
kWh
|
$388
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $224 | $865 |
$224
7,327
kWh
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $760 | - |
$529
17,585
kWh
|
$231
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $103 | $50 |
$72
2,345
kWh
|
$31
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.7198: Reduce / eliminate use of disposable product | $2,575 | $2,704 | - | - |
$2,500
-
gal
|
$(-3.0)
-
lb
|
- | $78 | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $54,760 | $210,137 | - | - | - | - | $54,760 | - | |
TOTAL RECOMMENDED | $59,701 | $213,756 |
$1,716
56,858
kWh
|
$650
-
kW-mo/yr
|
$2,500
-
gal
|
$(-3.0)
-
lb
|
$54,760 | $78 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs