ITAC Assessment: IA0226
ITAC logo
ITAC Assessment: IA0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product grain processing equipment
NAICS
n/a
SIC 3547: Rolling Mill Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 4,750
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,677 817,409
kWh
Electricity Demand $9,625 2,808
kW-mo/yr
Natural Gas $15,738 3,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,279 - $891
29,601
kWh
$388
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $224 $865 $224
7,327
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $760 - $529
17,585
kWh
$231
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $103 $50 $72
2,345
kWh
$31
-
kW-mo/yr
- - - -
05 3.7198: Reduce / eliminate use of disposable product $2,575 $2,704 - - $2,500
-
gal
$(-3.0)
-
lb
- $78
06 4.111: Add equipment/ operators to reduce production bottleneck $54,760 $210,137 - - - - $54,760 -
TOTAL RECOMMENDED $59,701 $213,756 $1,716
56,858
kWh
$650
-
kW-mo/yr
$2,500
-
gal
$(-3.0)
-
lb
$54,760 $78
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs