Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Special dies and tools, die sets, jigs and fixtures, and industrial molds
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0286 #05 Y:2024 Install occupancy sensors $449 $1,292
UA0286 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $3,777 $1,950
UA0286 #03 Y:2024 Install timers and/or thermostats $5,869 $616
UA0286 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $25,164 $3,000
UA0286 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $35,619 $21,591
NL0080 #09 Y:2023 Repair furnaces and oven doors so that they seal efficiently $171 $80
NL0080 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $186 $420
NL0080 #07 Y:2023 Install outside air damper / economizer on hvac unit $423 $844
NL0080 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $754 $660
NL0080 #05 Y:2023 Insulate bare equipment $761 $560
NL0080 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,163 $4,000
NL0080 #03 Y:2023 Use optimum size and capacity equipment $4,846 $4,160
NL0080 #02 Y:2023 Improve air circulation with destratification fans / other methods $7,690 $38,085
NL0080 #01 Y:2023 Chill water to the highest temperature possible $7,794 $120
UC2303 #09 Y:2023 Use battery storage for demand control $11,455 $55,867
UC2303 #08 Y:2023 Use heat pump for space conditioning $3,229 $13,224
UC2303 #07 Y:2023 Use solar heat to make electricty $47,312 $455,896
UC2303 #06 Y:2023 Replace existing chiller with high efficiency model $6,257 $36,220
UC2303 #05 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $16,066 $176,604
UC2303 #04 Y:2023 Turn off equipment when not in use $1,129 $500