ITAC Assessment: UC2303
ITAC logo
ITAC Assessment: UC2303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Injection molds and composite parts
NAICS 332710: Machine Shops
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 11,880
ft2
Annual Production 20,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,776 674,688
kWh
Electricity Demand $37,095 1,759
kW-mo/yr
Electricity Fees $(-171.7) -
Natural Gas $1,948 109
MMBtu
TOTAL YEARLY COSTS $102,647
RECOMMENDED SAVINGS* $86,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $284 $500 $284
3,004
kWh
- - - -
02 2.2122: Install / repair insulation on condensate lines $115 $696 $60
634
kWh
$55
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $870 $2,800 $666
7,050
kWh
$204
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $1,129 $500 $1,129
11,943
kWh
- - - -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $16,066 $176,604 $922
9,750
kWh
$4,218
-
kW-mo/yr
$13,050 $(-2,123.8)
-
MMBtu
-
06 2.2622: Replace existing chiller with high efficiency model $6,257 $36,220 $3,533
37,379
kWh
$2,723
-
kW-mo/yr
- - -
07 2.9114: Use solar heat to make electricty $47,312 $455,896 $54,904
580,990
kWh
- - - $(-7,592.0)
08 2.7234: Use heat pump for space conditioning $3,229 $13,224 $275
2,912
kWh
$485
-
kW-mo/yr
$521 $1,948
-
MMBtu
-
09 2.3141: Use battery storage for demand control $11,455 $55,867 $(-76.6)
(-810)
kWh
$2,782
-
kW-mo/yr
$8,750 - -
TOTAL RECOMMENDED $86,718 $742,306 $61,697
652,851
kWh
$10,468
-
kW-mo/yr
$22,321 $(-175.9)
-
MMBtu
$(-7,592.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs