ITAC Assessment: NL0080
ITAC logo
ITAC Assessment: NL0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Tools, Dies, Plastic Fixtures
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 38,000
ft2
Annual Production 720,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,961 1,388,499
kWh
Electricity Demand $60,685 3,757
kW-mo/yr
Electricity Fees $5,019 -
Natural Gas $3,938 297
MMBtu
Waste Disposal Costs
Water Usage $358 161
Tgal
Water Disposal $477 161
Tgal
TOTAL YEARLY COSTS $105,438
RECOMMENDED SAVINGS* $23,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2625: Chill water to the highest temperature possible $7,794 $120 $4,053
162,120
kWh
$3,741
-
kW-mo/yr
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $7,690 $38,085 $364
14,540
kWh
$1,326
-
kW-mo/yr
- - $6,000
03 2.4323: Use optimum size and capacity equipment $4,846 $4,160 - $4,846
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,163 $4,000 $352
14,083
kWh
$696
-
kW-mo/yr
$115 - -
05 2.2511: Insulate bare equipment $761 $560 $761
30,444
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $754 $660 $1,334
53,378
kWh
- $(-480.0) $(-100.0) -
07 2.7241: Install outside air damper / economizer on hvac unit $423 $844 $423
16,924
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $186 $420 $12
488
kWh
$11
-
kW-mo/yr
$163 - -
09 2.1135: Repair furnaces and oven doors so that they seal efficiently $171 $80 $171
6,836
kWh
- - - -
TOTAL RECOMMENDED $23,788 $48,929 $7,470
298,813
kWh
$10,621
-
kW-mo/yr
$(-202.0) $(-100.0) $6,000
TOTAL IMPLEMENTED $15,338 $10,284 $6,345
253,829
kWh
$9,295
-
kW-mo/yr
$(-202.0) $(-100.0) -