Assessment Year | 1991 |
---|---|
Principal Product | FIBERGLASS BOATS |
NAICS |
n/a
|
SIC | 3732: Boat Building and Repairing |
Sales Range | $50 M to 100M |
# of Employees | 270 |
Plant Area |
n/a
|
Annual Production | 4,500
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,741 | 1,919,109 |
kWh
|
$0.044 |
Natural Gas | $61,349 | 14,091 |
MMBtu
|
$4.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,366 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,190 | $276 |
$1,190
25,791
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $445 | - |
$445
9,965
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,397 | - |
$1,697
38,394
kWh
|
- | $(-300.0) | |
04 | 2.7261: Install timers and/or thermostats | $10,794 | $6,200 | - |
$10,794
-
MMBtu
|
- | |
05 | 2.2437: Recover waste heat from equipment | $2,644 | $3,510 | - |
$2,644
-
MMBtu
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $896 | $2,600 |
$896
20,223
kWh
|
- | - | |
TOTAL RECOMMENDED | $17,366 | $12,586 |
$4,228
94,373
kWh
|
$13,438
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $17,366 | $12,586 |
$4,228
94,373
kWh
|
$13,438
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs