Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,004

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metalworking machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0695 #11 Y:2026 Reschedule plant operations or reduce load to avoid peaks $30,787 -
SD0695 #10 Y:2026 Use most efficient type of electric motors $11,501 $7,751
SD0695 #09 Y:2026 Install compressor air intakes in coolest locations $10,897 $1,675
SD0695 #08 Y:2026 Install compressor air intakes in coolest locations $3,026 $1,675
SD0695 #07 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $17,287 $12,600
SD0695 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,523 $11,400
SD0695 #05 Y:2026 Eliminate third shift $12,209 -
SD0695 #04 Y:2026 Use battery storage for demand control $77,444 $42,200
SD0695 #03 Y:2026 Use solar heat to make electricty $79,930 $100,757
SD0695 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,075 -
SD0695 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $92 $169
UC2607 #16 Y:2026 Clear and rent existing space $1,100,000 $3,727,100
UC2607 #15 Y:2026 Use solar heat to make electricty $192,702 $652,725
UC2607 #14 Y:2026 Use solar heat to make electricty $4,817 $600
UC2607 #13 Y:2026 Begin a practice of predictive / preventative maintenance $1,859 $7,400
UC2607 #12 Y:2026 Clean and maintain refrigerant condensers and towers $17,918 $1,625
UC2607 #11 Y:2026 Install timers and/or thermostats $5,903 $2,000
UC2607 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $730 $2,800
UC2607 #09 Y:2026 Make a practice of turning off lights when not needed $617 -
UC2607 #08 Y:2026 Use photocell controls $344 $945