ITAC Assessment: MU0057
ITAC logo
ITAC Assessment: MU0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Machinned tools
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 28,000
ft2
Annual Production 62,000
units
Production Hrs. Annual 5,954
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,669 1,164,795
kWh
Electricity Fees $5,384 -
Natural Gas $3,933 582
MMBtu
Other Energy $1,641 1
MMBtu
TOTAL YEARLY COSTS $175,627
RECOMMENDED SAVINGS* $60,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,622 - $2,622
18,731
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $596 - $596
4,258
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $12,535 $24,704 $12,535
89,553
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $5,897 $4,100 $5,897
42,122
kWh
- -
05 2.6218: Turn off equipment when not in use $1,118 - $1,118
7,979
kWh
- -
06 2.7134: Use photocell controls $381 $1,824 $381
2,721
kWh
- -
07 2.7135: Install occupancy sensors $819 $824 $819
5,887
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,761 - $4,761
34,006
kWh
- -
09 2.7221: Lower temperature during the winter season and vice-versa $223 - - $223
-
MMBtu
-
10 2.7261: Install timers and/or thermostats $528 $1,180 - $528
-
MMBtu
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,583 $4,257 $484
3,456
kWh
$1,099
-
MMBtu
-
12 2.7492: Use proper thickness of insulation on building envelope $4,569 $10,184 $1,985
14,179
kWh
$2,584
-
MMBtu
-
13 2.9114: Use solar heat to make electricty $24,103 $157,869 $24,103
172,166
kWh
- -
14 4.821: Pay bills on time to avoid late fees $269 - - - $269
TOTAL RECOMMENDED $60,004 $204,942 $55,301
395,058
kWh
$4,434
-
MMBtu
$269
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs