| Assessment Year | 2024 |
|---|---|
| Principal Product | Machinned tools |
| NAICS | 333515: Cutting Tool and Machine Tool Accessory Manufacturing |
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 51 |
| Plant Area |
28,000
ft2
|
| Annual Production | 62,000
units
|
| Production Hrs. Annual | 5,954
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $164,669 | 1,164,795 |
kWh
|
$0.14 |
| Electricity Fees | $5,384 | - |
|
- |
| Natural Gas | $3,933 | 582 |
MMBtu
|
$6.76 |
| Other Energy | $1,641 | 1 |
MMBtu
|
$1,640.53 |
| TOTAL YEARLY COSTS | $175,627 | |||
| RECOMMENDED SAVINGS* | $60,004 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,395 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,622 | - |
$2,622
18,731
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $596 | - |
$596
4,258
kWh
|
- | - | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $12,535 | $24,704 |
$12,535
89,553
kWh
|
- | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $5,897 | $4,100 |
$5,897
42,122
kWh
|
- | - | |
| 05 | 2.6218: Turn off equipment when not in use | $1,118 | - |
$1,118
7,979
kWh
|
- | - | |
| 06 | 2.7134: Use photocell controls | $381 | $1,824 |
$381
2,721
kWh
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $819 | $824 |
$819
5,887
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,761 | - |
$4,761
34,006
kWh
|
- | - | |
| 09 | 2.7221: Lower temperature during the winter season and vice-versa | $223 | - | - |
$223
-
MMBtu
|
- | |
| 10 | 2.7261: Install timers and/or thermostats | $528 | $1,180 | - |
$528
-
MMBtu
|
- | |
| 11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,583 | $4,257 |
$484
3,456
kWh
|
$1,099
-
MMBtu
|
- | |
| 12 | 2.7492: Use proper thickness of insulation on building envelope | $4,569 | $10,184 |
$1,985
14,179
kWh
|
$2,584
-
MMBtu
|
- | |
| 13 | 2.9114: Use solar heat to make electricty | $24,103 | $157,869 |
$24,103
172,166
kWh
|
- | - | |
| 14 | 4.821: Pay bills on time to avoid late fees | $269 | - | - | - | $269 | |
| TOTAL RECOMMENDED | $60,004 | $204,942 |
$55,301
395,058
kWh
|
$4,434
-
MMBtu
|
$269 | ||
| TOTAL IMPLEMENTED | $16,395 | $7,104 |
$15,375
109,817
kWh
|
$751
-
MMBtu
|
$269 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs