Assessment Year | 1997 |
---|---|
Principal Product | furniture |
NAICS |
n/a
|
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
430,000
ft2
|
Annual Production | 93,740
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,288 | 2,306,272 |
kWh
|
$0.034 |
Electricity Demand | $79,576 | 9,369 |
kW-mo/yr
|
$8.49 |
Electricity Fees | $(-44.0) | - |
|
- |
Natural Gas | $37,974 | 5,617 |
MMBtu
|
$6.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,398 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,928 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $1,444 | $132 |
$610
20,223
kWh
|
$834
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $1,963 | $5,372 | - | - |
$1,963
-
MMBtu
|
- | - | - | - | - | |
03 | 2.3212: Optimize plant power factor | $1,998 | $1,500 | - |
$1,998
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $463 | $880 |
$463
15,240
kWh
|
- | - | - | - | - | - | - | |
05 | 2.7134: Use photocell controls | $3,037 | $722 |
$3,037
98,183
kWh
|
- | - | - | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $201 | $287 | - | - |
$201
-
MMBtu
|
- | - | - | - | - | |
07 | 2.7261: Install timers and/or thermostats | $16,230 | $7,925 |
$3,513
115,768
kWh
|
- |
$12,717
-
MMBtu
|
- | - | - | - | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $20,100 | - | - | - | - | - |
$20,100
-
lb
|
- | - | - | |
09 | 3.5217: Reuse / recycle/ sell paper products | $2,556 | - | - | - | - | - |
$756
-
lb
|
$(-300.0) | $2,100 | - | |
10 | 3.5313: Increase amount of waste recovered for resale | $46,900 | - | - | - | - | - |
$46,900
-
lb
|
- | - | - | |
11 | 3.1191: Change procedures / equipment / operating conditions | $18,007 | $25,000 | - | - | - |
$1,600
-
gal
|
- | - | - | $16,407 | |
12 | 2.8112: Combine utility meters | $1,499 | $1,920 | - | - | - | - | - | - | $1,499 | - | |
TOTAL RECOMMENDED | $114,398 | $43,738 |
$7,623
249,414
kWh
|
$2,832
-
kW-mo/yr
|
$14,881
-
MMBtu
|
$1,600
-
gal
|
$67,756
-
lb
|
$(-300.0) | $3,599 | $16,407 | ||
TOTAL IMPLEMENTED | $23,928 | $11,764 |
$4,123
135,991
kWh
|
$2,832
-
kW-mo/yr
|
$12,918
-
MMBtu
|
- |
$756
-
lb
|
$(-300.0) | $3,599 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs