364
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Conveyors and conveying equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0388 #02 Y:2011 | 02 | 2011 | Use radiant heater for spot heating | $30,750 | $20,000 | |
| BD0388 #01 Y:2011 | 01 | 2011 | Replace heat treating oven with more efficient unit | $12,465 | $60,000 | |
| CO0645 #07 Y:2010 | 07 | 2010 | Install vinyl strip / high speed / air curtain doors | $160 | $200 | |
| CO0645 #06 Y:2010 | 06 | 2010 | Improve air circulation with destratification fans / other methods | $1,560 | $7,980 | |
| CO0645 #05 Y:2010 | 05 | 2010 | Use solar heat to make electricty | $2,000 | $21,500 | |
| CO0645 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $2,930 | $5,260 | |
| CO0645 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $15,950 | $33,510 | |
| CO0645 #02 Y:2010 | 02 | 2010 | Use most efficient type of electric motors | $630 | $3,010 | |
| CO0645 #01 Y:2010 | 01 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,890 | $1,290 | |
| NC0396 #07 Y:2009 | 07 | 2009 | Recover waste heat from equipment | $3,690 | $5,306 | |
| NC0396 #06 Y:2009 | 06 | 2009 | Reduce the pressure of compressed air to the minimum required | $1,507 | - | |
| NC0396 #05 Y:2009 | 05 | 2009 | Utilize higher efficiency lamps and/or ballasts | $313 | $132 | |
| NC0396 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $600 | $558 | |
| NC0396 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $37,090 | $83,137 | |
| NC0396 #02 Y:2009 | 02 | 2009 | Condense operation into one building | $31,185 | $13,100 | |
| NC0396 #01 Y:2009 | 01 | 2009 | Replace existing hvac unit with high efficiency model | $76,612 | $275,318 | |
| WI0496 #08 Y:2005 | 08 | 2005 | Install compressor air intakes in coolest locations | $677 | $1,280 | |
| WI0496 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,397 | - | |
| WI0496 #06 Y:2005 | 06 | 2005 | Replace hydraulic / pneumatic equipment with electric equipment | $1,445 | $2,000 | |
| WI0496 #05 Y:2005 | 05 | 2005 | Modify workload | $2,970 | - |