Assessment Year | 2011 |
---|---|
Principal Product | Conveyors and Conveying Equipment |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 96 |
Plant Area |
95,200
ft2
|
Annual Production | 1,600
pieces
|
Production Hrs. Annual | 2,219
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,815 | 1,127,700 |
kWh
|
$0.045 |
Electricity Demand | $76,520 | 4,494 |
kW-mo/yr
|
$17.03 |
Electricity Fees | $2,012 | - |
|
- |
Natural Gas | $52,085 | 6,836 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,890 | $1,290 |
$1,780
39,000
kWh
|
$3,110
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $630 | $3,010 |
$180
3,900
kWh
|
$450
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,950 | $33,510 |
$5,420
119,000
kWh
|
$10,370
-
kW-mo/yr
|
- | $190 | $(-30.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,930 | $5,260 |
$990
22,100
kWh
|
$1,940
-
kW-mo/yr
|
- | $30 | $(-30.0) | |
05 | 2.9114: Use solar heat to make electricty | $2,000 | $21,500 |
$710
15,600
kWh
|
$1,290
-
kW-mo/yr
|
- | - | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,560 | $7,980 |
$(-140.0)
(-3,000)
kWh
|
$(-80.0)
-
kW-mo/yr
|
$1,780
-
MMBtu
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $160 | $200 | - | - |
$160
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $28,120 | $72,750 |
$8,940
196,600
kWh
|
$17,080
-
kW-mo/yr
|
$1,940
-
MMBtu
|
$220 | $(-60.0) | ||
TOTAL IMPLEMENTED | $21,000 | $35,000 |
$7,200
158,000
kWh
|
$13,480
-
kW-mo/yr
|
$160
-
MMBtu
|
$190 | $(-30.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs