Assessment Year 1984
Principal Product ARTIFICIAL LIMBS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range less than $500
k
# of Employees 5
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,430 26,671
kWh
Natural Gas $534 77
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $434

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7292: Lower ceiling to reduce conditioned space $283 $3,500 $158
2,931
kWh
$125
-
MMBtu
02 2.7314: Reduce ventilation air $48 $250 - $48
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $87 $20 $32
586
kWh
$55
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $16 - $16
293
kWh
-
TOTAL RECOMMENDED $434 $3,770 $206
3,810
kWh
$228
-
MMBtu
TOTAL IMPLEMENTED $434 $3,770 $206
3,810
kWh
$228
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs