ITAC Assessment: WI0496
ITAC logo
ITAC Assessment: WI0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Conveyors
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 210,000
ft2
Annual Production 8,750
pieces
Production Hrs. Annual 2,625
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,023 1,965,960
kWh
Electricity Demand $76,586 7,104
kW-mo/yr
Electricity Fees $28,081 -
Natural Gas $35,845 3,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.424: Improve space comfort conditioning $21,656 $6,750 - - - $21,656 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,914 $57,240 $7,563
204,965
kWh
$10,351
-
kW-mo/yr
- - -
03 2.7261: Install timers and/or thermostats $4,904 - - - $4,904
-
MMBtu
- -
04 3.7137: Replace cloth rags with paper towels $3,540 - - - - - $3,540
05 4.426: Modify workload $2,970 - - - - $2,970 -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,445 $2,000 $1,445
39,165
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,397 - $623
16,878
kWh
$1,014
-
kW-mo/yr
- $(-240.0) -
08 2.4221: Install compressor air intakes in coolest locations $677 $1,280 $257
6,974
kWh
$420
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $54,503 $67,270 $9,888
267,982
kWh
$11,785
-
kW-mo/yr
$4,904
-
MMBtu
$24,386 $3,540
TOTAL IMPLEMENTED $44,474 $63,990 $7,563
204,965
kWh
$10,351
-
kW-mo/yr
$4,904
-
MMBtu
$21,656 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs