Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2605 #06 Y:2026 Replace fossil fuel equipment with electrical equipment $78,865 $433,647
LS2605 #05 Y:2026 Upgrade controls on compressors $2,498 $12,500
LS2605 #04 Y:2026 Install sub-metering equipment $6,258 $5,250
LS2605 #03 Y:2026 Clean and maintain refrigerant condensers and towers $1,247 $490
LS2605 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $365 $45
LS2605 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,280 $25
LS2519 #06 Y:2025 Use solar heat to make electricty $60,880 $526,500
LS2519 #05 Y:2025 Replace fossil fuel equipment with electrical equipment $12,167 $48,183
LS2519 #04 Y:2025 Upgrade controls on compressors $1,639 $6,250
LS2519 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $535 $1,252
LS2519 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,764 $450
LS2519 #01 Y:2025 Install timers and/or thermostats $1,145 $50
LT8379 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $14,508 $5,600
LT8379 #03 Y:2023 Turn off equipment when not in use $2,673 $1,193
LT8379 #02 Y:2023 Install occupancy sensors $844 $2,073
LT8379 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,184 $17,100
LS2208 #09 Y:2021 Use solar heat to make electricty $15,212 $215,340
LS2208 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $10,440 $14,643
LS2208 #07 Y:2021 Install occupancy sensors $304 $114
LS2208 #06 Y:2021 Use waste heat from hot flue gases to preheat $9,660 $2,800