ITAC Assessment: LS2519
ITAC logo
ITAC Assessment: LS2519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Oil field tools
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 53,062
ft2
Annual Production 178,713
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,858 568,961
kWh
Natural Gas $11,990 894
MMBtu
Fuel Oil #1 $5,132 179
MMBtu
TOTAL YEARLY COSTS $91,980
RECOMMENDED SAVINGS* $78,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $1,145 $50 $1,145
8,673
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,764 $450 $1,764
13,366
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $535 $1,252 $535
4,053
kWh
- -
04 2.4224: Upgrade controls on compressors $1,639 $6,250 $1,639
12,414
kWh
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $12,167 $48,183 $(-906.0)
(-6,864)
kWh
$5,073
-
MMBtu
$8,000
06 2.9114: Use solar heat to make electricty $60,880 $526,500 $60,880
423,797
kWh
- -
TOTAL RECOMMENDED $78,130 $582,685 $65,057
455,439
kWh
$5,073
-
MMBtu
$8,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs