| Assessment Year | 2025 |
|---|---|
| Principal Product | Oil field tools |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 48 |
| Plant Area |
53,062
ft2
|
| Annual Production | 178,713
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,858 | 568,961 |
kWh
|
$0.13 |
| Natural Gas | $11,990 | 894 |
MMBtu
|
$13.41 |
| Fuel Oil #1 | $5,132 | 179 |
MMBtu
|
$28.67 |
| TOTAL YEARLY COSTS | $91,980 | |||
| RECOMMENDED SAVINGS* | $78,130 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $1,145 | $50 |
$1,145
8,673
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,764 | $450 |
$1,764
13,366
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $535 | $1,252 |
$535
4,053
kWh
|
- | - | |
| 04 | 2.4224: Upgrade controls on compressors | $1,639 | $6,250 |
$1,639
12,414
kWh
|
- | - | |
| 05 | 2.1321: Replace fossil fuel equipment with electrical equipment | $12,167 | $48,183 |
$(-906.0)
(-6,864)
kWh
|
$5,073
-
MMBtu
|
$8,000 | |
| 06 | 2.9114: Use solar heat to make electricty | $60,880 | $526,500 |
$60,880
461,210
kWh
|
- | - | |
| TOTAL RECOMMENDED | $78,130 | $582,685 |
$65,057
492,852
kWh
|
$5,073
-
MMBtu
|
$8,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs