Assessment Year | 2019 |
---|---|
Principal Product | Copper |
NAICS | 212234: Copper Ore and Nickel Ore Mining |
SIC | 1021: Copper Ores |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
236,790
ft2
|
Annual Production | 53,700
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $5,143,832 | 213,581,205 |
kWh
|
$0.024 |
Electricity Demand | $6,927,291 | 344,958 |
kW-mo/yr
|
$20.08 |
TOTAL YEARLY COSTS | $12,071,123 | |||
RECOMMENDED SAVINGS* | $894,583 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $71,477 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $377,567 | $872,000 |
$176,321
7,316,212
kWh
|
$201,246
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $373,488 | $10,000 | - |
$373,488
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $68,566 | $36,000 |
$32,019
1,328,000
kWh
|
$36,547
-
kW-mo/yr
|
|
04 | 2.4224: Upgrade controls on compressors | $47,010 | $23,850 |
$21,950
910,800
kWh
|
$25,060
-
kW-mo/yr
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $25,041 | $5,000 |
$11,692
485,129
kWh
|
$13,349
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,250 | $4,719 |
$1,050
43,651
kWh
|
$1,200
-
kW-mo/yr
|
|
07 | 2.7134: Use photocell controls | $661 | $440 |
$661
27,417
kWh
|
- | |
TOTAL RECOMMENDED | $894,583 | $952,009 |
$243,693
10,111,209
kWh
|
$650,890
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $71,477 | $41,159 |
$33,730
1,399,068
kWh
|
$37,747
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs