| Assessment Year | 2022 |
|---|---|
| Principal Product | Oil Field Tools |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | less than $500 k |
| # of Employees | 80 |
| Plant Area |
342,511
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 4,004
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,642 | 1,395,660 |
kWh
|
$0.10 |
| Fuel Oil #2 | $46,715 | 1,945 |
MMBtu
|
$24.02 |
| TOTAL YEARLY COSTS | $192,357 | |||
| RECOMMENDED SAVINGS* | $50,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,256 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2694: Use highest temperature for chilling or cold storage | $378 | $10 |
$378
3,626
kWh
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $7,289 | $200 |
$7,289
69,845
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $651 | $50 |
$651
6,235
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,527 | $450 |
$5,527
52,968
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $975 | $240 |
$975
9,340
kWh
|
- | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $9,660 | $2,800 | - |
$9,660
-
MMBtu
|
|
| 07 | 2.7135: Install occupancy sensors | $304 | $114 |
$304
2,915
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,440 | $14,643 |
$10,440
100,048
kWh
|
- | |
| 09 | 2.9114: Use solar heat to make electricty | $15,212 | $215,340 |
$15,212
145,769
kWh
|
- | |
| TOTAL RECOMMENDED | $50,436 | $233,847 |
$40,776
390,746
kWh
|
$9,660
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,256 | $15,293 |
$23,256
222,861
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs