ITAC Assessment: KU0264
ITAC logo
ITAC Assessment: KU0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CARBONATED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 3,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,090 1,075,909
kWh
Natural Gas $38,880 10,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,741 $2,720 $1,741
33,411
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $825 $40 $825
15,826
kWh
- -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $566 $1,200 $(-52.0)
(-879)
kWh
- $618
04 2.1123: Install automatic stack damper $663 $650 - $663
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $229 - $153
2,931
kWh
$76
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $168 - $168
3,224
kWh
- -
TOTAL RECOMMENDED $4,192 $4,610 $2,835
54,513
kWh
$739
-
MMBtu
$618
TOTAL IMPLEMENTED $3,300 $3,960 $2,682
51,582
kWh
- $618
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs