ITAC Assessment: OR0563
ITAC logo
ITAC Assessment: OR0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Wood Boards, Chip
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 565,000
ft2
Annual Production 1,150,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,263 16,628,000
kWh
Electricity Demand $200,860 60,912
kW-mo/yr
Electricity Fees $142,019 -
Wood $597,904 434,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,401,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $265,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.4323: Use optimum size and capacity equipment $35,913 $17,860 $35,913
862,672
kWh
- -
02 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $219,003 $250,000 $850,000
13,808,232
kWh
$(-390,000.0)
-
MMBtu
$(-240,997.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,600 $244,000 $46,600
1,120,000
kWh
- -
04 3.1191: Change procedures / equipment / operating conditions $1,100,000 $2,150,000 - - $1,100,000
TOTAL RECOMMENDED $1,401,516 $2,661,860 $932,513
15,790,904
kWh
$(-390,000.0)
-
MMBtu
$859,003
TOTAL IMPLEMENTED $265,603 $494,000 $896,600
14,928,232
kWh
$(-390,000.0)
-
MMBtu
$(-240,997.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs