25
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Mining machinery and equipment, except oil and gas field machinery and equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NT0006 #06 Y:2023 | 06 | 2023 | Replace existing chiller with high efficiency model | $151,941 | $2,205,000 | |
| NT0006 #05 Y:2023 | 05 | 2023 | Adjust / maintain fork lift trucks for most efficient operation | $16,552 | - | |
| NT0006 #04 Y:2023 | 04 | 2023 | Optimize plant power factor | $12,361 | $27,064 | |
| NT0006 #03 Y:2023 | 03 | 2023 | Lower temperature during the winter season and vice-versa | $15,942 | - | |
| NT0006 #02 Y:2023 | 02 | 2023 | Lower temperature during the winter season and vice-versa | $1,685 | - | |
| NT0006 #01 Y:2023 | 01 | 2023 | Upgrade controls on compressors | $34,941 | $10,056 | |
| TA0129 #05 Y:2006 | 05 | 2006 | Apply for tax-free status for energy purchases | $48,887 | - | |
| TA0129 #04 Y:2006 | 04 | 2006 | Insulate glazing, walls, ceilings, and roofs | $940 | $300 | |
| TA0129 #03 Y:2006 | 03 | 2006 | Keep doors and windows shut when not on use | $10,615 | - | |
| TA0129 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $6,372 | - | |
| TA0129 #01 Y:2006 | 01 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,250 | $1,944 | |
| TA0123 #04 Y:2006 | 04 | 2006 | Install timers on light switches in little used areas | $2,515 | $340 | |
| TA0123 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,565 | $780 | |
| TA0123 #02 Y:2006 | 02 | 2006 | Recharge batteries on during off-peak demand periods | $13,420 | - | |
| TA0123 #01 Y:2006 | 01 | 2006 | Install vinyl strip / high speed / air curtain doors | $148,735 | $46,560 | |
| TA0067 #10 Y:2003 | 10 | 2003 | Reduce the pressure of compressed air to the minimum required | $2,940 | $200 | |
| TA0067 #09 Y:2003 | 09 | 2003 | Utilize higher efficiency lamps and/or ballasts | $2,910 | - | |
| TA0067 #08 Y:2003 | 08 | 2003 | Establish a preventative maintenance program | $3,960 | $2,510 | |
| TA0067 #07 Y:2003 | 07 | 2003 | Turn off equipment when not in use | $4,240 | - | |
| TA0067 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $6,970 | $13,700 |