Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mining machinery and equipment, except oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0006 #06 Y:2023 Replace existing chiller with high efficiency model $151,941 $2,205,000
NT0006 #05 Y:2023 Adjust / maintain fork lift trucks for most efficient operation $16,552 -
NT0006 #04 Y:2023 Optimize plant power factor $12,361 $27,064
NT0006 #03 Y:2023 Lower temperature during the winter season and vice-versa $15,942 -
NT0006 #02 Y:2023 Lower temperature during the winter season and vice-versa $1,685 -
NT0006 #01 Y:2023 Upgrade controls on compressors $34,941 $10,056
TA0129 #05 Y:2006 Apply for tax-free status for energy purchases $48,887 -
TA0129 #04 Y:2006 Insulate glazing, walls, ceilings, and roofs $940 $300
TA0129 #03 Y:2006 Keep doors and windows shut when not on use $10,615 -
TA0129 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $6,372 -
TA0129 #01 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $2,250 $1,944
TA0123 #04 Y:2006 Install timers on light switches in little used areas $2,515 $340
TA0123 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $4,565 $780
TA0123 #02 Y:2006 Recharge batteries on during off-peak demand periods $13,420 -
TA0123 #01 Y:2006 Install vinyl strip / high speed / air curtain doors $148,735 $46,560
TA0067 #10 Y:2003 Reduce the pressure of compressed air to the minimum required $2,940 $200
TA0067 #09 Y:2003 Utilize higher efficiency lamps and/or ballasts $2,910 -
TA0067 #08 Y:2003 Establish a preventative maintenance program $3,960 $2,510
TA0067 #07 Y:2003 Turn off equipment when not in use $4,240 -
TA0067 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $6,970 $13,700