ITAC Assessment: NT0006
ITAC logo
ITAC Assessment: NT0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Mining Machinery and Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 1,451
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $978,683 8,983,661
kWh
Electricity Demand $184,810 20,983
kW-mo/yr
Electricity Fees $93,617 -
Natural Gas $8,645 814
MMBtu
Waste Disposal Costs
Water Usage $76,548 7,316
Tgal
TOTAL YEARLY COSTS $1,342,302
RECOMMENDED SAVINGS* $233,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4224: Upgrade controls on compressors $34,941 $10,056 $34,941
323,524
kWh
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $1,685 - $1,685
15,476
kWh
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $15,942 - $15,942
146,390
kWh
- - -
04 2.3212: Optimize plant power factor $12,361 $27,064 - $12,361
-
kW-mo/yr
- -
05 2.8227: Adjust / maintain fork lift trucks for most efficient operation $16,552 - $15,683
144,014
kWh
$869
-
kW-mo/yr
- -
06 2.2622: Replace existing chiller with high efficiency model $151,941 $2,205,000 $34,475
316,577
kWh
$11,602
-
kW-mo/yr
$57,864
-
Tgal
$48,000
TOTAL RECOMMENDED $233,422 $2,242,120 $102,726
945,981
kWh
$24,832
-
kW-mo/yr
$57,864
-
Tgal
$48,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs