ITAC Assessment: AM0293
ITAC logo
ITAC Assessment: AM0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Folding paperboard boxes and sanitary food containers
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 102,000
ft2
Annual Production 140,000
ton
Production Hrs. Annual 8,712
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,376 6,434,349
kWh
Electricity Demand $95,494 11,351
kW-mo/yr
Electricity Fees $(-12,606.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,055

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,800 $1,000 $10,800
468,933
kWh
- - - -
02 2.4133: Use most efficient type of electric motors $780 $1,370 $390
18,464
kWh
$390
-
kW-mo/yr
- - -
03 3.5217: Reuse / recycle/ sell paper products $3,330 - - - $3,330
-
lb
- -
04 2.7314: Reduce ventilation air $2,430 $2,100 $510
39,273
kWh
$1,920
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,570 $150 $1,570
68,288
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $475 $100
2,931
kWh
$50
-
kW-mo/yr
- $870 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $150 $940
41,032
kWh
- - - -
08 2.7314: Reduce ventilation air $820 $30 $170
13,189
kWh
$650
-
kW-mo/yr
- - -
09 2.8121: Apply for tax-free status for energy purchases $745 $1,490 - - - - $745
TOTAL RECOMMENDED $22,435 $6,765 $14,480
652,110
kWh
$3,010
-
kW-mo/yr
$3,330
-
lb
$870 $745
TOTAL IMPLEMENTED $14,055 $2,790 $13,310
578,253
kWh
- - - $745
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs