Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0848 #04 Y:2022 Utilize energy-efficient belts and other improved mechanisms $149 $408
AM0848 #03 Y:2022 Install occupancy sensors $889 $1,568
AM0848 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,821 $1,000
AM0848 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $2,136 $13
AM0804 #05 Y:2020 Reduce the pressure of compressed air to the minimum required $505 $13
AM0804 #04 Y:2020 Reduce illumination to minimum necessary levels $630 $100
AM0804 #03 Y:2020 Turn off equipment when not in use $11,800 -
AM0804 #02 Y:2020 Optimize plant power factor $11,260 $16,200
AM0804 #01 Y:2020 Apply for tax-free status for energy purchases $124,900 $15,000
AM0735 #08 Y:2017 Reduce the pressure of compressed air to the minimum required $195 $15
AM0735 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,105 $410
AM0735 #06 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $500
AM0735 #05 Y:2017 Reuse rags until completely soiled $880 -
AM0735 #04 Y:2017 Install occupancy sensors $920 $1,700
AM0735 #03 Y:2017 Make a practice of turning off lights when not needed $2,770 $320
AM0735 #02 Y:2017 Install equipment (eg compactor) to reduce disposal costs $8,320 $4,120
AM0735 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $18,250 $52,360
AM0696 #08 Y:2015 Make a practice of turning off lights when not needed $130 -
AM0696 #07 Y:2015 Install occupancy sensors $280 $630
AM0696 #06 Y:2015 Install efficient rectifiers $375 $2,000