ITAC Assessment: AM0848
ITAC logo
ITAC Assessment: AM0848
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Agricultural Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 230,000
ft2
Annual Production 1,135
units
Production Hrs. Annual 2,288
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,625 2,201,400
kWh
Electricity Demand $47,008 7,013
kW-mo/yr
Electricity Fees $94,926 -
Natural Gas $65,110 9,299
MMBtu
TOTAL YEARLY COSTS $349,669
RECOMMENDED SAVINGS* $4,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,136 $13 $1,367
21,166
kWh
$769
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,821 $1,000 $1,165
18,044
kWh
$656
-
kW-mo/yr
03 2.7135: Install occupancy sensors $889 $1,568 $889
13,769
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $149 $408 $65
1,017
kWh
$84
-
kW-mo/yr
TOTAL RECOMMENDED $4,995 $2,989 $3,486
53,996
kWh
$1,509
-
kW-mo/yr
TOTAL IMPLEMENTED $2,859 $2,976 $2,119
32,830
kWh
$740
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs