Assessment Year | 2017 |
---|---|
Principal Product | Trenchers |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 66 |
Plant Area |
100,000
ft2
|
Annual Production | 12
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,946 | 1,206,100 |
kWh
|
$0.043 |
Electricity Demand | $54,190 | 5,412 |
kW-mo/yr
|
$10.01 |
Electricity Fees | $667 | - |
|
- |
LPG | $8,493 | 425 |
MMBtu
|
$19.98 |
TOTAL YEARLY COSTS | $115,296 | |||
RECOMMENDED SAVINGS* | $33,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,165 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,250 | $52,360 |
$9,450
210,000
kWh
|
$8,800
-
kW-mo/yr
|
- | - | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,320 | $4,120 | - | - | - | $8,320 | |
03 | 2.7124: Make a practice of turning off lights when not needed | $2,770 | $320 |
$1,630
36,200
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $920 | $1,700 |
$920
20,500
kWh
|
- | - | - | |
05 | 3.7132: Reuse rags until completely soiled | $880 | - | - | - | - | $880 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,160 | $500 |
$575
12,800
kWh
|
$585
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,105 | $410 |
$95
2,145
kWh
|
$25
-
kW-mo/yr
|
$985 | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $195 | $15 |
$95
2,100
kWh
|
$100
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $33,600 | $59,425 |
$12,765
283,745
kWh
|
$10,650
-
kW-mo/yr
|
$985 | $9,200 | ||
TOTAL IMPLEMENTED | $24,165 | $53,590 |
$11,750
261,145
kWh
|
$10,550
-
kW-mo/yr
|
$985 | $880 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs