| Assessment Year | 1991 |
|---|---|
| Principal Product | ALUMINUM OIL COOLERS |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
n/a
|
| Annual Production | 48,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,464 | 3,844,666 |
kWh
|
$0.051 |
| Natural Gas | $95,817 | 30,731 |
MMBtu
|
$3.12 |
| LPG | $24,120 | 3,298 |
MMBtu
|
$7.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,485 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,485 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2531: Re-size charging openings or add movable cover or door | $30,358 | $17,288 |
$30,358
595,252
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,865 | $390 |
$9,865
193,435
kWh
|
- | - | - | |
| 03 | 2.2153: Close off unneeded steam lines | $1,536 | - | - |
$1,189
-
MMBtu
|
$347
-
MMBtu
|
- | |
| 04 | 2.2514: Cover open tanks | $944 | $500 | - |
$731
-
MMBtu
|
$213
-
MMBtu
|
- | |
| 05 | 2.2163: Use minimum steam operating pressure | $417 | - | - |
$322
-
MMBtu
|
$95
-
MMBtu
|
- | |
| 06 | 2.7123: Keep lamps and reflectors clean | $1,855 | $5,475 |
$1,555
30,481
kWh
|
- | - | $300 | |
| 07 | 2.6232: Install set-back timers | $613 | - |
$613
12,016
kWh
|
- | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $553 | $490 |
$553
10,844
kWh
|
- | - | - | |
| 09 | 2.6218: Turn off equipment when not in use | $344 | $470 |
$344
6,741
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $46,485 | $24,613 |
$43,288
848,769
kWh
|
$2,242
-
MMBtu
|
$655
-
MMBtu
|
$300 | ||
| TOTAL IMPLEMENTED | $46,485 | $24,613 |
$43,288
848,769
kWh
|
$2,242
-
MMBtu
|
$655
-
MMBtu
|
$300 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs