ITAC Assessment: MA0709
ITAC logo
ITAC Assessment: MA0709
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product treated drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 4
Plant Area 38,900
ft2
Annual Production 9,106,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,940 5,025,572
kWh
Electricity Demand $93,939 9,138
kW-mo/yr
Natural Gas $39,253 4,318
MMBtu
Fuel Oil #2 $3,704 136
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,306 $74,300 $25,306
214,099
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $15,578 $162,500 $15,578
131,799
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,963 $60,000 $6,917
58,520
kWh
$(-1,954.0)
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $588 $200 $588
4,977
kWh
-
TOTAL RECOMMENDED $46,435 $297,000 $48,389
409,395
kWh
$(-1,954.0)
-
MMBtu
TOTAL IMPLEMENTED $588 $200 $588
4,977
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs