ITAC Assessment: TT0034
ITAC logo
ITAC Assessment: TT0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Vacuum Cleaning Equipment
NAICS 335210: Small Electrical Appliance Manufacturing
SIC 3635: Household Vacuum Cleaners
Sales Range less than $500
k
# of Employees 370
Plant Area 310,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $723,421 12,178,800
kWh
Electricity Demand $91,793 21,557
kW-mo/yr
Electricity Fees $12,228 -
Natural Gas $96,133 7,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $20,000 $47,500 $15,780
228,689
kWh
$4,220
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,800 $2,500 $4,800
69,293
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $3,250 $4,800 - - $3,250
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,900 $800 $2,900
32,675
kWh
- -
05 2.2628: Utilize a less expensive cooling method $13,300 $20,000 $13,300
224,000
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,950 $5,000 $3,700
62,160
kWh
$1,250
-
kW-mo/yr
-
07 2.2623: Minimize condenser cooling water temperature $4,000 - $3,000
50,400
kWh
$1,000
-
kW-mo/yr
-
08 2.2625: Chill water to the highest temperature possible $2,400 - $1,800
30,240
kWh
$600
-
kW-mo/yr
-
TOTAL RECOMMENDED $55,600 $80,600 $45,280
697,457
kWh
$7,070
-
kW-mo/yr
$3,250
TOTAL IMPLEMENTED $9,300 $800 $7,700
113,315
kWh
$1,600
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs