ITAC Assessment: KU0075
ITAC logo
ITAC Assessment: KU0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product AUTOMOTIVE BATTERIES
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 700,000
pieces
Production Hrs. Annual 5,440
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,296 6,591,442
kWh
Natural Gas $53,088 22,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,345 $2,826 $2,345
60,082
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $961 $1,200 - $961
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $3,626 $100 $3,626
92,907
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $354 $74 - $354
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $284 $300 - $284
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $221 $60 $221
5,569
kWh
-
TOTAL RECOMMENDED $7,791 $4,560 $6,192
158,558
kWh
$1,599
-
MMBtu
TOTAL IMPLEMENTED $7,791 $4,560 $6,192
158,558
kWh
$1,599
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs