Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal foil and leaf
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0794 #05 Y:2018 Recover waste heat from equipment $710 $2,583
MA0794 #04 Y:2018 Install timers and/or thermostats $1,216 $852
MA0794 #03 Y:2018 Insulate bare equipment $2,123 $4,092
MA0794 #02 Y:2018 Replace existing chiller with high efficiency model $14,204 $51,700
MA0794 #01 Y:2018 Replace electrically-operated equipment with fossil fuel equipment $84,640 $121,500
MZ0052 #05 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $12,546 $1,000
MZ0052 #04 Y:2010 Optimize plant power factor $9,103 $8,984
MZ0052 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $15,361 $18,360
MZ0052 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $6,855 $16,700
MZ0052 #01 Y:2010 Install compressor air intakes in coolest locations $4,921 $1,160
MS0329 #06 Y:2008 Install compressor air intakes in coolest locations $500 $912
MS0329 #05 Y:2008 Utilize energy-efficient belts and other improved mechanisms $844 $1,500
MS0329 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $2,327 $7,955
MS0329 #03 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $2,458 $256
MS0329 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $4,660 $8,899
MS0329 #01 Y:2008 Analyze flue gas for proper air/fuel ratio $172,142 $1,000
MA0609 #10 Y:2006 Reduce the pressure of compressed air to the minimum required $652 -
MA0609 #09 Y:2006 Insulate bare equipment $849 $600
MA0609 #08 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $300
MA0609 #07 Y:2006 Improve air circulation with destratification fans / other methods $1,227 $3,200