Assessment Year | 2018 |
---|---|
Principal Product | Hot stamp foil |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3497: Metal Foil and Leaf |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
60,000
ft2
|
Annual Production | 450,000
units
|
Production Hrs. Annual | 6,168
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $509,937 | 4,640,250 |
kWh
|
$0.11 |
Electricity Demand | $238,300 | 11,760 |
kW-mo/yr
|
$20.26 |
Electricity Fees | $2,676 | - |
|
- |
Natural Gas | $105,912 | 11,779 |
MMBtu
|
$8.99 |
TOTAL YEARLY COSTS | $856,825 | |||
RECOMMENDED SAVINGS* | $102,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,856 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $84,640 | $121,500 |
$95,066
864,235
kWh
|
$24,074
-
kW-mo/yr
|
$(-34,500.0)
-
MMBtu
|
|
02 | 2.2622: Replace existing chiller with high efficiency model | $14,204 | $51,700 |
$14,204
129,128
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $2,123 | $4,092 | - | - |
$2,123
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $1,216 | $852 |
$1,216
11,050
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $710 | $2,583 | - | - |
$710
-
MMBtu
|
|
TOTAL RECOMMENDED | $102,893 | $180,727 |
$110,486
1,004,413
kWh
|
$24,074
-
kW-mo/yr
|
$(-31,667.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $85,856 | $122,352 |
$96,282
875,285
kWh
|
$24,074
-
kW-mo/yr
|
$(-34,500.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs