ITAC Assessment: MA0794
ITAC logo
ITAC Assessment: MA0794
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Hot stamp foil
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3497: Metal Foil and Leaf
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 6,168
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $509,937 4,640,250
kWh
Electricity Demand $238,300 11,760
kW-mo/yr
Electricity Fees $2,676 -
Natural Gas $105,912 11,779
MMBtu
TOTAL YEARLY COSTS $856,825
RECOMMENDED SAVINGS* $102,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $84,640 $121,500 $95,066
864,235
kWh
$24,074
-
kW-mo/yr
$(-34,500.0)
-
MMBtu
02 2.2622: Replace existing chiller with high efficiency model $14,204 $51,700 $14,204
129,128
kWh
- -
03 2.2511: Insulate bare equipment $2,123 $4,092 - - $2,123
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,216 $852 $1,216
11,050
kWh
- -
05 2.2437: Recover waste heat from equipment $710 $2,583 - - $710
-
MMBtu
TOTAL RECOMMENDED $102,893 $180,727 $110,486
1,004,413
kWh
$24,074
-
kW-mo/yr
$(-31,667.0)
-
MMBtu
TOTAL IMPLEMENTED $85,856 $122,352 $96,282
875,285
kWh
$24,074
-
kW-mo/yr
$(-34,500.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs