| Assessment Year | 1995 |
|---|---|
| Principal Product | Remanufactured Carbulators |
| NAICS |
n/a
|
| SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 380 |
| Plant Area |
98,000
ft2
|
| Annual Production | 280,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,384 | 1,488,277 |
kWh
|
$0.083 |
| Natural Gas | $1,270 | 165 |
MMBtu
|
$7.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,056 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,056 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,343 | $5,870 |
$2,343
28,136
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,546 | $3,100 |
$9,546
115,182
kWh
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,310 | $200 |
$3,310
39,859
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,072 | $2,426 |
$1,072
12,896
kWh
|
|
| 05 | 2.7144: Install spectral reflectors / delamp | $1,957 | $2,820 |
$1,957
21,395
kWh
|
|
| 06 | 2.7135: Install occupancy sensors | $381 | $591 |
$381
4,103
kWh
|
|
| 07 | 2.7134: Use photocell controls | $447 | $28 |
$447
4,982
kWh
|
|
| TOTAL RECOMMENDED | $19,056 | $15,035 |
$19,056
226,553
kWh
|
||
| TOTAL IMPLEMENTED | $19,056 | $15,035 |
$19,056
226,553
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs