ITAC Assessment: UD0877
ITAC logo
ITAC Assessment: UD0877
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Potato Chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 113,000
ft2
Annual Production 5,500,500
lb
Production Hrs. Annual 2,652
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,851 1,649,754
kWh
Electricity Demand $14,893 5,244
kW-mo/yr
Electricity Fees $95 -
Natural Gas $167,578 38,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.6225: Eliminate third shift $75,782 - $11,262
125,689
kWh
$3,902
-
kW-mo/yr
$21,735
-
MMBtu
- - $38,883
02 3.4155: Meter waste water $18,660 $1,000 - - - $18,660
-
Tgal
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,981 $14,250 $8,109
90,486
kWh
$872
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,143 $8,200 $4,566
50,953
kWh
$577
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,183 $1,000 $3,610
40,281
kWh
$573
-
kW-mo/yr
- - - -
06 2.4226: Use / purchase optimum sized compressor $2,095 - $2,095
23,379
kWh
- - - - -
07 2.4322: Use or replace with energy efficient substitutes $262 $500 $235
2,624
kWh
$27
-
kW-mo/yr
- - - -
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $61,182 $25,000 $2,495
27,850
kWh
$178
-
kW-mo/yr
$27,664
-
MMBtu
- $30,845 -
09 2.1233: Analyze flue gas for proper air/fuel ratio $685 $2,000 - - $685
-
MMBtu
- - -
TOTAL RECOMMENDED $176,973 $51,950 $32,372
361,262
kWh
$6,129
-
kW-mo/yr
$50,084
-
MMBtu
$18,660
-
Tgal
$30,845 $38,883
TOTAL IMPLEMENTED $158,404 $28,000 $15,852
176,918
kWh
$4,080
-
kW-mo/yr
$50,084
-
MMBtu
$18,660
-
Tgal
$30,845 $38,883
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs