ITAC Assessment: MA0609
ITAC logo
ITAC Assessment: MA0609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Slit plastic and paper films, cable fillers, non-woven films
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3497: Metal Foil and Leaf
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 52,200
ft2
Annual Production 1,250,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,043 3,816,964
kWh
Electricity Demand $79,378 8,417
kW-mo/yr
Natural Gas $31,199 2,399
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $45,854 $54,000 $50,787
513,000
kWh
$19,166
-
kW-mo/yr
$(-24,099.0)
-
MMBtu
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $11,356 $40,000 $(-1,782.0)
(-18,000)
kWh
$(-340.0)
-
kW-mo/yr
$13,478
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,050 $5,000 $1,960
19,800
kWh
$350
-
kW-mo/yr
$2,740
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,398 $19,100 $3,980
40,200
kWh
$418
-
kW-mo/yr
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $3,871 $7,500 $3,871
39,100
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $1,436 $2,200 $901
9,100
kWh
$535
-
kW-mo/yr
-
07 2.7243: Improve air circulation with destratification fans / other methods $1,227 $3,200 $(-257.0)
(-2,600)
kWh
$(-38.0)
-
kW-mo/yr
$1,522
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $300 $1,158
11,700
kWh
- -
09 2.2511: Insulate bare equipment $849 $600 $713
7,200
kWh
$136
-
kW-mo/yr
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $652 - $545
5,500
kWh
$107
-
kW-mo/yr
-
TOTAL RECOMMENDED $75,851 $131,900 $61,876
625,000
kWh
$20,334
-
kW-mo/yr
$(-6,359.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs