428
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Heating equipment, except electric and warm air furnaces | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0697 #11 Y:2026 | 11 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $786 | $1,442 |
n/a
|
| WV0697 #10 Y:2026 | 10 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,041 | $450 |
n/a
|
| WV0697 #09 Y:2026 | 09 | 2026 | Upgrade controls on compressors | $1,453 | $2,015 |
n/a
|
| WV0697 #08 Y:2026 | 08 | 2026 | Develop a repair/replace policy | $1,821 | $4,975 |
n/a
|
| WV0697 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $2,152 | $1,620 |
n/a
|
| WV0697 #06 Y:2026 | 06 | 2026 | Install set-back timers | $2,393 | $1,225 |
n/a
|
| WV0697 #05 Y:2026 | 05 | 2026 | Analyze flue gas for proper air/fuel ratio | $3,285 | $1,296 |
n/a
|
| WV0697 #04 Y:2026 | 04 | 2026 | Establish a predictive maintenance program | $2,950 | $3,300 |
n/a
|
| WV0697 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,389 | $625 |
n/a
|
| WV0697 #02 Y:2026 | 02 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $9,066 | $22,250 |
n/a
|
| WV0697 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $17,550 | $21,788 |
n/a
|
| OK1159 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,450 | $2,555 |
n/a
|
| OK1159 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $226 | - |
n/a
|
| OK1159 #02 Y:2025 | 02 | 2025 | Recharge batteries on during off-peak demand periods | $2,568 | - |
n/a
|
| OK1159 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $4,131 | $5,755 |
n/a
|
| OK1155 #03 Y:2025 | 03 | 2025 | Install timers and/or thermostats | $559 | $1,182 |
n/a
|
| OK1155 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $7,739 | $8,470 |
n/a
|
| OK1155 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $16,194 | $117,000 |
n/a
|
| OK1153 #04 Y:2025 | 04 | 2025 | Conserve energy by efficient use of vending machines | $804 | $900 |
n/a
|
| OK1153 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,794 | $5,610 |
n/a
|