| Assessment Year | 2025 |
|---|---|
| Principal Product | Air Conditioner Components |
| NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
| SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
45,500
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $135,056 | 2,250,927 |
kWh
|
$0.060 | |
| Electricity Demand | $62,222 | 6,100 |
kW-mo/yr
|
$10.20 | |
| Natural Gas | $10,574 | 2,250 |
MMBtu
|
$4.70 | |
| Waste Disposal Costs | |||||
| Water Usage | $15,202 | 4,310 |
Tgal
|
$3.53 | |
| Water Disposal | $32,294 | 4,310 |
Tgal
|
$7.49 | |
| TOTAL YEARLY COSTS | $255,348 | ||||
| RECOMMENDED SAVINGS* | $29,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,079 | $4,144 |
$1,049
17,481
kWh
|
$1,030
-
kW-mo/yr
|
- | |
| 02 | 2.9114: Use solar heat to make electricty | $21,879 | $215,280 |
$21,879
364,643
kWh
|
- | - | |
| 03 | 2.7261: Install timers and/or thermostats | $2,139 | $3,510 | - | - |
$2,139
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $670 | - |
$670
11,172
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,376 | $5,473 |
$2,376
39,603
kWh
|
- | - | |
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $508 | $570 |
$508
8,462
kWh
|
- | - | |
| TOTAL RECOMMENDED | $29,651 | $228,977 |
$26,482
441,361
kWh
|
$1,030
-
kW-mo/yr
|
$2,139
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs