ITAC Assessment: MZ0221
ITAC logo
ITAC Assessment: MZ0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product automotive axles and drive shafts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 136,000
ft2
Annual Production 352,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,144 3,344,365
kWh
Electricity Demand $76,470 8,707
kW-mo/yr
Natural Gas $32,729 4,551
MMBtu
Waste Disposal Costs
Water Usage $4,861 486,075
Tgal
TOTAL YEARLY COSTS $477,204
RECOMMENDED SAVINGS* $24,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $10,101 $1,160 $8,655
79,400
kWh
$1,446
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $4,200 - $4,200
38,535
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,574 $100 $4,913
45,072
kWh
- $1,661
-
MMBtu
04 2.7135: Install occupancy sensors $1,286 $2,350 $1,286
11,796
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,974 - $1,974
18,112
kWh
- -
TOTAL RECOMMENDED $24,135 $3,610 $21,028
192,915
kWh
$1,446
-
kW-mo/yr
$1,661
-
MMBtu
TOTAL IMPLEMENTED $24,135 $3,610 $21,028
192,915
kWh
$1,446
-
kW-mo/yr
$1,661
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs