ITAC Assessment: BD0232
ITAC logo
ITAC Assessment: BD0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Copper Based Sand Castings
NAICS 331529: Other Nonferrous Metal Foundries (except Die-Casting)
SIC 3366: Copper Foundries
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 3,220
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,566 6,164,400
kWh
Electricity Demand $102,081 10,067
kW-mo/yr
Electricity Fees $508 -
Natural Gas $74,563 9,460
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,953 - $871
28,637
kWh
$1,082
-
kW-mo/yr
- - - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,559 $2,240 $626
20,608
kWh
$779
-
kW-mo/yr
- - - $78 $76 -
03 2.4133: Use most efficient type of electric motors $1,485 $3,400 $769
25,251
kWh
$716
-
kW-mo/yr
- - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $794 $700 $354
11,652
kWh
$440
-
kW-mo/yr
- - - - - -
05 2.7135: Install occupancy sensors $574 $1,050 $215
7,461
kWh
$359
-
kW-mo/yr
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $513 $195 $106
3,478
kWh
$131
-
kW-mo/yr
- - - $217 $59 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $527 $140 $241
7,937
kWh
$286
-
kW-mo/yr
- - - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $9,224 $5,500 - - $(-100.0) - $12,852
-
lb
$(-3,528.0) - -
09 3.5316: Contract a wood pallet recycling company $1,450 $1,000 - - - - $2,500
-
lb
$(-1,050.0) - -
10 3.4151: Minimize water usage $592 $1,265 - - - $592
-
Tgal
- - - -
11 4.821: Pay bills on time to avoid late fees $214 - - - - - - - - $214
TOTAL RECOMMENDED $18,885 $15,490 $3,182
105,024
kWh
$3,793
-
kW-mo/yr
$(-100.0) $592
-
Tgal
$15,352
-
lb
$(-4,283.0) $135 $214
TOTAL IMPLEMENTED $9,661 $9,990 $3,182
105,024
kWh
$3,793
-
kW-mo/yr
- $592
-
Tgal
$2,500
-
lb
$(-755.0) $135 $214
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs