ITAC Assessment: WM0243
ITAC logo
ITAC Assessment: WM0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gas Fireplaces
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area 500,000
ft2
Annual Production 169,730
units
Production Hrs. Annual 5,200
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $774,810 11,938,320
kWh
Electricity Demand $579,930 34,476
kW-mo/yr
Electricity Fees $74,134 -
Natural Gas $1,447,276 113,528
MMBtu
Waste Disposal Costs
Water Usage $101,328 10,105
Tgal
TOTAL YEARLY COSTS $2,977,478
RECOMMENDED SAVINGS* $189,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $103,411 $360,000 - - - $103,411
-
MMBtu
02 2.2522: Isolate hot or cold equipment $65,812 $40,930 - - $(-945.6) $66,758
-
MMBtu
03 2.7224: Reduce space conditioning during non-working hours $15,013 $3,550 $7,671
118,015
kWh
$2,954
-
kW-mo/yr
- $4,388
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,986 $6,560 $1,869
28,752
kWh
$1,117
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,814 $7,679 $1,339
20,604
kWh
$474
-
kW-mo/yr
- -
TOTAL RECOMMENDED $189,034 $418,719 $10,879
167,371
kWh
$4,545
-
kW-mo/yr
$(-945.6) $174,556
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs