Assessment Year | 2025 |
---|---|
Principal Product | Gas Fireplaces |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $100 M to 500M |
# of Employees | 420 |
Plant Area |
500,000
ft2
|
Annual Production | 169,730
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $774,810 | 11,938,320 |
kWh
|
$0.065 | |
Electricity Demand | $579,930 | 34,476 |
kW-mo/yr
|
$16.82 | |
Electricity Fees | $74,134 | - |
|
- | |
Natural Gas | $1,447,276 | 113,528 |
MMBtu
|
$12.75 | |
Waste Disposal Costs | |||||
Water Usage | $101,328 | 10,105 |
Tgal
|
$10.03 | |
TOTAL YEARLY COSTS | $2,977,478 | ||||
RECOMMENDED SAVINGS* | $189,034 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $103,411 | $360,000 | - | - | - |
$103,411
-
MMBtu
|
|
02 | 2.2522: Isolate hot or cold equipment | $65,812 | $40,930 | - | - | $(-945.6) |
$66,758
-
MMBtu
|
|
03 | 2.7224: Reduce space conditioning during non-working hours | $15,013 | $3,550 |
$7,671
118,015
kWh
|
$2,954
-
kW-mo/yr
|
- |
$4,388
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,986 | $6,560 |
$1,869
28,752
kWh
|
$1,117
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,814 | $7,679 |
$1,339
20,604
kWh
|
$474
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $189,034 | $418,719 |
$10,879
167,371
kWh
|
$4,545
-
kW-mo/yr
|
$(-945.6) |
$174,556
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs