ITAC Assessment: UD0277
ITAC logo
ITAC Assessment: UD0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STORAGE EQUIPMENT
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,435 902,110
kWh
Natural Gas $78,193 24,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,698 $500 - $3,698
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $2,053 $250 - $2,053
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $2,413 $1,125 - $2,413
-
MMBtu
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,165 $1,500 $1,213
48,945
kWh
$(-330.0)
-
MMBtu
$282
05 2.7142: Utilize higher efficiency lamps and/or ballasts $746 $1,500 $571
8,206
kWh
- $175
06 2.7492: Use proper thickness of insulation on building envelope $1,464 $5,850 - $1,464
-
MMBtu
-
TOTAL RECOMMENDED $11,539 $10,725 $1,784
57,151
kWh
$9,298
-
MMBtu
$457
TOTAL IMPLEMENTED $11,539 $10,725 $1,784
57,151
kWh
$9,298
-
MMBtu
$457
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs