ITAC Assessment: LL0191
ITAC logo
ITAC Assessment: LL0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Oil Field Equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 60,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,052 791,886
kWh
Electricity Demand $25,256 4,555
kW-mo/yr
Electricity Fees $5,358 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $23,552 $3,917 $22,324
301,109
kWh
- $1,228 -
02 2.7134: Use photocell controls $10,938 $420 $10,368
139,849
kWh
- $570 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,388 $4,960 $6,055
81,668
kWh
- $333 -
04 2.8112: Combine utility meters $2,825 $420 - - $2,825 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $880 $20 - $546
-
kW-mo/yr
$334 -
06 2.7135: Install occupancy sensors $571 $750 $541
7,292
kWh
- $30 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $507 $508 $222
2,996
kWh
- $12 $273
08 2.8123: Pay utility bills on time $273 $30 - - $273 -
09 4.611: Begin a practice of predictive / preventative maintenance $2,500 $60 - - - $2,500
10 4.611: Begin a practice of predictive / preventative maintenance $792 $237 - - - $792
TOTAL RECOMMENDED $49,226 $11,322 $39,510
532,914
kWh
$546
-
kW-mo/yr
$5,605 $3,565
TOTAL IMPLEMENTED $21,969 $6,965 $17,186
231,805
kWh
- $1,218 $3,565
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs