ITAC Assessment: UF0562
ITAC logo
ITAC Assessment: UF0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Dehydration Equipment, Desiccant & Refrigerated Dryers
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 90,000
ft2
Annual Production 1,682
units
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,622 1,715,610
kWh
Electricity Demand $64,638 7,983
kW-mo/yr
Electricity Fees $22,703 -
Natural Gas $4,342 1,019
MMBtu
LPG $15,212 370
MMBtu
Waste Disposal Costs
Water Usage $688 246
Tgal
Water Disposal $2,240 246
Tgal
TOTAL YEARLY COSTS $227,445
RECOMMENDED SAVINGS* $58,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.7425: Clean or color roof to reduce solar load $30,571 $24,600 $(-67.0)
(-973)
kWh
- $30,638
02 2.4133: Use most efficient type of electric motors $11,635 $4,086 $6,894
99,912
kWh
$4,741
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $4,271 - $4,271
61,903
kWh
- -
04 2.4112: Install soft-start to eliminate nuisance trips $3,128 $7,733 $3,128
45,334
kWh
- -
05 2.7135: Install occupancy sensors $2,645 $4,780 $2,645
38,329
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $2,545 $1,778 $2,545
36,877
kWh
- -
07 2.7141: Lower light fixtures in high ceiling areas $2,484 $2,380 $1,639
23,751
kWh
$845
-
kW-mo/yr
-
08 2.7134: Use photocell controls $904 - $904
13,104
kWh
- -
TOTAL RECOMMENDED $58,183 $45,357 $21,959
318,237
kWh
$5,586
-
kW-mo/yr
$30,638
TOTAL IMPLEMENTED $22,000 $10,644 $17,259
250,125
kWh
$4,741
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs