21
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0822 #12 Y:2010 | 12 | 2010 | Install fossil fuel make-up air unit | $1,500 | $14,900 | |
| UD0822 #11 Y:2010 | 11 | 2010 | Reduce space conditioning during non-working hours | $2,147 | $2,100 | |
| UD0822 #10 Y:2010 | 10 | 2010 | Reduce space conditioning during non-working hours | $3,483 | $63 | |
| UD0822 #09 Y:2010 | 09 | 2010 | Use or replace with energy efficient substitutes | $13,033 | $39,100 | |
| UD0822 #08 Y:2010 | 08 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,449 | $500 | |
| UD0822 #07 Y:2010 | 07 | 2010 | Use most efficient type of electric motors | $2,219 | $5,273 | |
| UD0822 #06 Y:2010 | 06 | 2010 | Utilize controls to operate equipment only when needed | $2,400 | $2,000 | |
| UD0822 #05 Y:2010 | 05 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $677 | $125 | |
| UD0822 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $31,724 | $24,375 | |
| UD0822 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $12,399 | $8,760 | |
| UD0822 #02 Y:2010 | 02 | 2010 | Install wind powered electric generator | $244,092 | $1,216,000 | |
| UD0822 #01 Y:2010 | 01 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $609 | $609 | |
| UD0317 #03 Y:1990 | 03 | 1990 | Use waste heat from hot flue gases to preheat | $19,080 | $70,000 | |
| UD0317 #02 Y:1990 | 02 | 1990 | Redesign process | $27,328 | $30,000 | |
| UD0317 #01 Y:1990 | 01 | 1990 | Minimize water usage | $4,564 | $4,200 | |
| UD0178 #06 Y:1985 | 06 | 1985 | Install / repair insulation on steam lines | $114 | $150 | |
| UD0178 #05 Y:1985 | 05 | 1985 | Utilize higher efficiency lamps and/or ballasts | $262 | $225 | |
| UD0178 #04 Y:1985 | 04 | 1985 | Turn off equipment during breaks, reduce operating time | $1,380 | $100 | |
| UD0178 #03 Y:1985 | 03 | 1985 | Lower ceiling to reduce conditioned space | $414 | $1,250 | |
| UD0178 #02 Y:1985 | 02 | 1985 | Use hot process fluids to preheat incoming process fluids | $3,261 | $3,000 |