Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Heating equipment, except electric and warm air;
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0822 #12 Y:2010 Install fossil fuel make-up air unit $1,500 $14,900
UD0822 #11 Y:2010 Reduce space conditioning during non-working hours $2,147 $2,100
UD0822 #10 Y:2010 Reduce space conditioning during non-working hours $3,483 $63
UD0822 #09 Y:2010 Use or replace with energy efficient substitutes $13,033 $39,100
UD0822 #08 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $1,449 $500
UD0822 #07 Y:2010 Use most efficient type of electric motors $2,219 $5,273
UD0822 #06 Y:2010 Utilize controls to operate equipment only when needed $2,400 $2,000
UD0822 #05 Y:2010 Utilize energy-efficient belts and other improved mechanisms $677 $125
UD0822 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $31,724 $24,375
UD0822 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $12,399 $8,760
UD0822 #02 Y:2010 Install wind powered electric generator $244,092 $1,216,000
UD0822 #01 Y:2010 Reschedule plant operations or reduce load to avoid peaks $609 $609
UD0317 #03 Y:1990 Use waste heat from hot flue gases to preheat $19,080 $70,000
UD0317 #02 Y:1990 Redesign process $27,328 $30,000
UD0317 #01 Y:1990 Minimize water usage $4,564 $4,200
UD0178 #06 Y:1985 Install / repair insulation on steam lines $114 $150
UD0178 #05 Y:1985 Utilize higher efficiency lamps and/or ballasts $262 $225
UD0178 #04 Y:1985 Turn off equipment during breaks, reduce operating time $1,380 $100
UD0178 #03 Y:1985 Lower ceiling to reduce conditioned space $414 $1,250
UD0178 #02 Y:1985 Use hot process fluids to preheat incoming process fluids $3,261 $3,000