ITAC Assessment: WV0697
ITAC logo
ITAC Assessment: WV0697
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Vacuum Formed Ceramic Fiber Shapes
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 111,000
ft2
Annual Production 2,526,390
lb
Production Hrs. Annual 2,470
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,851 3,408,400
kWh
Electricity Demand $163,602 10,901
kW-mo/yr
Electricity Fees $58,945 -
Natural Gas $67,922 28,481
MMBtu
TOTAL YEARLY COSTS $508,320
RECOMMENDED SAVINGS* $45,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,550 $21,788 $6,428
100,587
kWh
$11,122
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,066 $22,250 - $9,066
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,389 $625 $1,438
22,499
kWh
$1,951
-
kW-mo/yr
- -
04 2.4157: Establish a predictive maintenance program $2,950 $3,300 $1,845
28,874
kWh
$2,507
-
kW-mo/yr
- $(-1,402.0)
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,285 $1,296 - - $3,285
-
MMBtu
-
06 2.6232: Install set-back timers $2,393 $1,225 $1,793
28,056
kWh
$600
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $2,152 $1,620 $921
14,416
kWh
$1,231
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $1,821 $4,975 $890
13,922
kWh
$1,201
-
kW-mo/yr
- $(-270.0)
09 2.4224: Upgrade controls on compressors $1,453 $2,015 $732
11,450
kWh
$721
-
kW-mo/yr
- -
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,041 $450 $441
6,897
kWh
$600
-
kW-mo/yr
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $786 $1,442 $335
5,252
kWh
$451
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,886 $60,986 $14,823
231,953
kWh
$29,450
-
kW-mo/yr
$3,285
-
MMBtu
$(-1,672.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs