ITAC Assessment: GT0883
ITAC logo
ITAC Assessment: GT0883
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Broadloom 12'
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 621
Plant Area 450,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,523,305 21,301,618
kWh
Natural Gas $626,251 118,523
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $1,910 $242 - $1,910
-
MMBtu
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $4,435 $800 - $4,435
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,504 $36,650 - $3,504
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $34,385 $107,085 - $34,385
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $4,404 $46,133 - $4,404
-
MMBtu
-
06 2.2424: Use heat in flue gases to preheat products or materials $42,689 $368,265 - $42,017
-
MMBtu
$672
-
Tgal
07 2.4235: Remove or close off unneeded compressed air lines $10,194 $7,000 $10,194
184,000
kWh
- -
TOTAL RECOMMENDED $101,521 $566,175 $10,194
184,000
kWh
$90,655
-
MMBtu
$672
-
Tgal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs