ITAC Assessment: UA0215
ITAC logo
ITAC Assessment: UA0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Composite Bus Panels
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $100
M
to 500
M
# of Employees 64
Plant Area 60,000
ft2
Annual Production 7,500
units
Production Hrs. Annual 2,125
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,149 916,200
kWh
Electricity Demand $19,280 4,815
kW-mo/yr
Electricity Fees $7,243 -
Natural Gas $47,219 4,650
MMBtu
TOTAL YEARLY COSTS $174,891
RECOMMENDED SAVINGS* $19,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7224: Reduce space conditioning during non-working hours $12,317 $50 $11,619
105,243
kWh
- $698
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,328 $11,266 $4,173
37,799
kWh
$853
-
kW-mo/yr
$302
03 2.7135: Install occupancy sensors $663 $539 $625
5,658
kWh
- $38
04 2.4231: Reduce the pressure of compressed air to the minimum required $816 $50 $610
5,524
kWh
$160
-
kW-mo/yr
$46
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $678 $970 $564
5,109
kWh
$76
-
kW-mo/yr
$38
TOTAL RECOMMENDED $19,802 $12,875 $17,591
159,333
kWh
$1,089
-
kW-mo/yr
$1,122
TOTAL IMPLEMENTED $13,811 $1,070 $12,793
115,876
kWh
$236
-
kW-mo/yr
$782
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs