Assessment Year | 2019 |
---|---|
Principal Product | Composite Bus Panels |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $100 M to 500M |
# of Employees | 64 |
Plant Area |
60,000
ft2
|
Annual Production | 7,500
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,149 | 916,200 |
kWh
|
$0.11 |
Electricity Demand | $19,280 | 4,815 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $7,243 | - |
|
- |
Natural Gas | $47,219 | 4,650 |
MMBtu
|
$10.15 |
TOTAL YEARLY COSTS | $174,891 | |||
RECOMMENDED SAVINGS* | $19,802 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,811 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $12,317 | $50 |
$11,619
105,243
kWh
|
- | $698 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,328 | $11,266 |
$4,173
37,799
kWh
|
$853
-
kW-mo/yr
|
$302 | |
03 | 2.7135: Install occupancy sensors | $663 | $539 |
$625
5,658
kWh
|
- | $38 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $816 | $50 |
$610
5,524
kWh
|
$160
-
kW-mo/yr
|
$46 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $678 | $970 |
$564
5,109
kWh
|
$76
-
kW-mo/yr
|
$38 | |
TOTAL RECOMMENDED | $19,802 | $12,875 |
$17,591
159,333
kWh
|
$1,089
-
kW-mo/yr
|
$1,122 | ||
TOTAL IMPLEMENTED | $13,811 | $1,070 |
$12,793
115,876
kWh
|
$236
-
kW-mo/yr
|
$782 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs