Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Modular HVAC Systems
NAICS 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 115,360
ft2
Annual Production 4,800
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,587 1,052,760
kWh
Electricity Demand $20,686 2,028
kW-mo/yr
Natural Gas $1,055 217
MMBtu
Waste Disposal Costs
Water Usage $2,377 595
Tgal
Water Disposal $2,969 595
Tgal
TOTAL YEARLY COSTS $113,674
RECOMMENDED SAVINGS* $24,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $16,194 $117,000 $16,194
197,493
kWh
-
02 2.7135: Install occupancy sensors $7,739 $8,470 $7,739
94,380
kWh
-
03 2.7261: Install timers and/or thermostats $559 $1,182 - $559
-
MMBtu
TOTAL RECOMMENDED $24,492 $126,652 $23,933
291,873
kWh
$559
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs