ITAC Assessment: OK0700
ITAC logo
ITAC Assessment: OK0700
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Frozen Pies
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 565,000
ft2
Annual Production 210,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,034,297 35,361,705
kWh
Electricity Demand $818,553 84,817
kW-mo/yr
Electricity Fees $2,516 -
Natural Gas $183,613 24,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $512,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $78,457 $36,299 - - $78,457
-
MMBtu
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $77,748 $3,000 - $77,748
-
kW-mo/yr
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,054 $6,238 $6,054
207,335
kWh
- - - - - -
04 2.1336: Install equipment to utilize waste fuel $293,585 $1,110,000 $47,961
1,642,500
kWh
$21,587
-
kW-mo/yr
$78,293
-
MMBtu
$145,744
-
lb
- - -
05 3.1191: Change procedures / equipment / operating conditions $29,149 $3,000 - - - - - $29,149 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $9,498 $21,600 $6,538
223,920
kWh
$2,960
-
kW-mo/yr
- - - - -
07 2.4224: Upgrade controls on compressors $7,492 $15,000 $7,492
256,580
kWh
- - - - - -
08 2.2511: Insulate bare equipment $5,958 $2,709 - - $5,958
-
MMBtu
- - - -
09 2.2511: Insulate bare equipment $942 $2,046 - - $942
-
MMBtu
- - - -
10 2.6232: Install set-back timers $1,529 $1,150 - - $1,529
-
MMBtu
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $1,733 $1,499 $194
6,658
kWh
$88
-
kW-mo/yr
- - $448 - $1,003
12 2.7142: Utilize higher efficiency lamps and/or ballasts $317 $156 $205
7,008
kWh
$93
-
kW-mo/yr
- - $85 - $(-66.0)
13 2.7135: Install occupancy sensors $205 $579 $205
7,030
kWh
- - - - - -
TOTAL RECOMMENDED $512,667 $1,203,276 $68,649
2,351,031
kWh
$102,476
-
kW-mo/yr
$165,179
-
MMBtu
$145,744
-
lb
$533 $29,149 $937
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs