| Assessment Year | 2004 |
|---|---|
| Principal Product | Frozen Pies |
| NAICS | 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing |
| SIC | 2053: Frozen Bakery Products, Except Bread |
| Sales Range | $100 M to 500M |
| # of Employees | 450 |
| Plant Area |
565,000
ft2
|
| Annual Production | 210,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,034,297 | 35,361,705 |
kWh
|
$0.029 |
| Electricity Demand | $818,553 | 84,817 |
kW-mo/yr
|
$9.65 |
| Electricity Fees | $2,516 | - |
|
- |
| Natural Gas | $183,613 | 24,652 |
MMBtu
|
$7.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $512,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $78,457 | $36,299 | - | - |
$78,457
-
MMBtu
|
- | - | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $77,748 | $3,000 | - |
$77,748
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,054 | $6,238 |
$6,054
207,335
kWh
|
- | - | - | - | - | - | |
| 04 | 2.1336: Install equipment to utilize waste fuel | $293,585 | $1,110,000 |
$47,961
1,642,500
kWh
|
$21,587
-
kW-mo/yr
|
$78,293
-
MMBtu
|
$145,744
-
lb
|
- | - | - | |
| 05 | 3.1191: Change procedures / equipment / operating conditions | $29,149 | $3,000 | - | - | - | - | - | $29,149 | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,498 | $21,600 |
$6,538
223,920
kWh
|
$2,960
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 2.4224: Upgrade controls on compressors | $7,492 | $15,000 |
$7,492
256,580
kWh
|
- | - | - | - | - | - | |
| 08 | 2.2511: Insulate bare equipment | $5,958 | $2,709 | - | - |
$5,958
-
MMBtu
|
- | - | - | - | |
| 09 | 2.2511: Insulate bare equipment | $942 | $2,046 | - | - |
$942
-
MMBtu
|
- | - | - | - | |
| 10 | 2.6232: Install set-back timers | $1,529 | $1,150 | - | - |
$1,529
-
MMBtu
|
- | - | - | - | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,733 | $1,499 |
$194
6,658
kWh
|
$88
-
kW-mo/yr
|
- | - | $448 | - | $1,003 | |
| 12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $317 | $156 |
$205
7,008
kWh
|
$93
-
kW-mo/yr
|
- | - | $85 | - | $(-66.0) | |
| 13 | 2.7135: Install occupancy sensors | $205 | $579 |
$205
7,030
kWh
|
- | - | - | - | - | - | |
| TOTAL RECOMMENDED | $512,667 | $1,203,276 |
$68,649
2,351,031
kWh
|
$102,476
-
kW-mo/yr
|
$165,179
-
MMBtu
|
$145,744
-
lb
|
$533 | $29,149 | $937 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs