ITAC Assessment: NC0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wood veneer
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 75,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 2,750
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,605 1,654,162
kWh
Electricity Demand $48,048 5,736
kW-mo/yr
Electricity Fees $4,456 -
Natural Gas $56,288 15,341
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $778 $1,676 $360
10,844
kWh
$418
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,187 $5,250 $563
16,706
kWh
$624
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $301 $352 $143
4,396
kWh
$158
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $221 $22 $105
3,224
kWh
$116
-
kW-mo/yr
- - - -
05 2.2136: Install / repair insulation on steam lines $869 $2,312 - - $869
-
MMBtu
- - -
06 2.1331: Burn a less expensive grade of fuel $60,860 $15,000 $34
879
kWh
$26
-
kW-mo/yr
$30,800
-
MMBtu
- - $30,000
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,045 $140,000 - - - $(-955.0)
-
MMBtu
$6,000
-
lb
-
08 3.5316: Contract a wood pallet recycling company $3,900 $100 - - - - $3,900
-
lb
-
TOTAL RECOMMENDED $73,161 $164,712 $1,205
36,049
kWh
$1,342
-
kW-mo/yr
$31,669
-
MMBtu
$(-955.0)
-
MMBtu
$9,900
-
lb
$30,000
TOTAL IMPLEMENTED $72,940 $164,690 $1,100
32,825
kWh
$1,226
-
kW-mo/yr
$31,669
-
MMBtu
$(-955.0)
-
MMBtu
$9,900
-
lb
$30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs